1
/
of
5
Yoycol
Cubic Flowconium Men's Curved Hem Long Tank Top
Cubic Flowconium Men's Curved Hem Long Tank Top
Regular price
$35.00
Regular price
$27.18
Sale price
$35.00
Unit price
/
per
Couldn't load pickup availability
Can team the bodybuilding stringer with various sweat pants, jogging pants, compression pants, Jersey pants and bermuda shorts, etc.
- Fabric: Jersey(95% polyester and 5% spandex)
- Regular fit
- Sleeveless, curved hem, slightly longer back
- Fabric weight: 180g/m²
- Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
| inch | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 29.1Â | 30.3Â | 31.1Â | 32.3Â | 33.1Â | 34.3Â | 35.0Â | 36.2Â |
| Back Length | 31.1Â | 32.3Â | 33.1Â | 34.3Â | 35.0Â | 36.2Â | 37.0Â | 38.2Â |
| Shoulder | 11.4Â | 11.8Â | 12.2Â | 12.6Â | 13.0Â | 13.4Â | 13.8Â | 14.2Â |
| Bust | 33.1Â | 37.0Â | 40.9Â | 44.9Â | 48.8Â | 52.8Â | 56.7Â | 60.6Â |
Â
| centimeter | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 74.0Â | 77.0Â | 79.0Â | 82.0Â | 84.0Â | 87.0Â | 89.0Â | 92.0Â |
| Back Length | 79.0Â | 82.0Â | 84.0Â | 87.0Â | 89.0Â | 92.0Â | 94.0Â | 97.0Â |
| Shoulder | 29.0Â | 30.0Â | 31.0Â | 32.0Â | 33.0Â | 34.0Â | 35.0Â | 36.0Â |
| Bust | 84.0Â | 94.0Â | 104.0Â | 114.0Â | 124.0Â | 134.0Â | 144.0Â | 154.0Â |
Â
Â
This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".
Share
Materials
Materials
Measurements
Measurements
Care information
Care information

Subscribe to our emails
Subscribe to our mailing list for insider news, product launches, and more.